
- Home
- Vanities
- Kitchen Cabinets
- Cabinet Collections
- Free Design Assistance
- Do-it-Yourself
- Plumbing
- Flooring
- Contractors
- Contact
- Step 1
- Step 2
- Step 3
- Step 4
- Step 5
- Step 6
- Step 7
- Step 8
- Step 9
Use a level and a pencil to draw a parallel line across the wall about 3 inches up from the floor. Measure down from this line, to the floor, and find the floors high point (if it has one), and mark a line at that point. From that high point, Measure up 34 1/2 inches and draw a level line across the wall to designate the top of the base cabinets.
Now that you have the top of the base cabinets marked, measure up another 19 1/2 inches and a level line across the wall to indicate the bottom of the wall cabinets. Lightly mark each cabinets' dimensions and placement on the wall to make sure that your orginal layout is correct.
Use a stud finder to locate the wall studs. Use a pencil to mark the stud locations at least 6 inches above and below the line for the bottom of the wall cabinets. Draw straight vertical lines between the top and bottom marks to indicate the center of the studs.
If you decided to go with the piece of 1' x 3' lumber, now is where you will use (if you decided to go with the U-shaped frame, it will come into play after all your lines are laid out). Screw a temporary 1' x 3' support rail to the wall, aligning the top edge of the rail with the line for the bottom edge of the wall cabinets. Attach it by driving 3 or 4 two inch screws through the rail into the wall studs.
Now that we have all the lines marked, it is time to start installing your kitchen cabinets. We are going to start with the corner cabinet (here is where your helper's extra set of hands will be needed). Place the corner cabinet onto the temporary support rail and have your helper hold the corner cabinet in place. Drill pilot holes through the sturdy cabinet back or its support rail and into the wall studs. Screw the cabinet into the wall using two screws that are long enough to penetrate the studs by at least 1 1/2 inches. Check the top of the cabinet for level and the front of the cabinet for plumb. If you have to correct the position, just back the screws out a little bit and top shims behind the cabinet at the stud locations. If it is plumb and level, drive the screws all the way in and add several more into each stud to ensure that the cabinet is secured tightly to the wall.
Now we are going to move onto the cabinets on either side of the corner cabinet. As you install each one, use the clamps to secure each cabinet to the neighboring cabinet and then check it for plumb with your level. On faceframe cabinets, it is a good idea to drill two 1/8 inch pilot holes through the sides of the faceframe and use screws. In this case, with frameless, ready-to-assemble kitchen cabinets we are going to screw thru the plywood sides and use shims in between the cabinets to ensure a tight fit and make sure that the cabinet faces are plumb.
After all the wall cabinets are in place, install the corner or end base case cabinet. Use shims where needed to level the cabinet and raise it up to the line which indicates the high point of the floor. Be sure it is level from front to back and from side to side, then screw it to the wall studs. If you don't have a diagonal corner cabinet or blind base cabinet in the corner, push the adjoining cabinet into place and clamp the two units together. Add a filler strip if needed to allow the doors and drawers enough clearance to open and close properly. If necessary, tap shims under the cabinet and behond it to adjust for plumb and level.
Drive screws through the cabinet back (and shims) into the wall studs. Trim any excess material from the shims with a sharp chisel or knife. Continue to add adjoining cabinets in this manner, joining them the same way you connected the wall cabinets in step 6.
If your cabinets end up butting against another wall, you may need a filler strip to make up the last few inches. If you have custom cabinets, they should have been built to fill this gap, but if you are using stock or RTA Kitchen Cabinets the filler strip may be needed. If you do need to use a filler strip, leave the last cabinet detached from the other cabinets. Clamp a straightedge to the face of the nearest installed unit, extending far enough for you to put alignment marks on the end wall. Allow a 3/4" offset behind those marks (for the thickness of the filler piece) and fasten a cleat to the wall. Then install and fasten the last cabinet and measure the gap between its face frame and the wall.
Superseal Direct: Step-by-Step
Kitchen Cabinet Installation Instructions
Read, breathe and measure accurately. Follow these step-by-step instructions and your cabinets will look like they were installed by a pro.
Once you have your Superseal Direct kitchen cabinets assembled, it is time to start prepping for installation. While it’s not too difficult to master the actual installation, the preparation work is the most important part of the process. In most cases, the floor is not going to be perfectly level and the walls are not going to be perfectly straight. That’s why the first critical step is to measure and mark the area. This will not only help you decide the best placement for your cabinets and studs, it also will allow you to foresee the need for adjustments and shims. Before we get started, there are a couple of items that you will need for the project: